As a LinkedIn member, youll join 225 million other professionals who are sharing connections, ideas, and opportunities.
Roading and infrastructure
Heavy duty pavement construction
Marine/port structures
Municipal infrastructure network assessment
Building construction and refurbishment
Estimating and contract administration
(11 months)
Provide programming, planning and scheduling service within a Civil Engineering infrastructure environment (using MS Project)
Apply planning, organising and measurement skills in order to efficiently manage operational resource utilisation constraints and priorities
Provide practical solutions to scheduling conflicts
Attend site visits and briefings in order to prepare detailed methodologies and programmes for tender submission
Liaise with project management team and client/stakeholders in order to communicate programme updates
Develop project risk registers
Provide support to project teams with delay and time extension claims
Contribute to the successful overall management and delivery of projects and operations within the Northern Region
Support, implement and adhere to Health and Safety policies and procedures
Support the culture that promotes and maintains SQE management
Assist in the management of the Regional Programme of Works, contract strategies and forecasting of work, revenue and costs
(4 years 2 months)
Provided engineering services that encompassed the maintenance and construction of port assets, namely heavy duty pavements, wharf structures, buildings, utilities and dredging.
Designed and prepared (using Autocad 2011) civil engineering infrastructure drawings for tender and construction purposes
Performed GPS surveys for design and to prepare as-built/mapping plans of port infrastructure
Prepared port development layout plans
Assisted in the preparation of tender documents
Managed construction projects
Managed contract payments in terms of the General Conditions of Contract NZS 3910
Participated in the preparation of maintenance budgets
Prepared road marking set out / realignment drawings and managed remarking of terminals and roadways
Managed quality and testing of asphaltic concrete and the granular pavement
Actively involved in setting up an Asset Management system as well as maintaining the database
(7 months)
Administered the Roading Network Maintenance Contract for Papatoetoe and Mangere wards
Developed draft annual work programmes
Reviewed and approved Contractor monthly work programmes
Verified and approved $1million, monthly contract payments in terms of the General Conditions of Contract NZS 3910
Liaised with Manukau City Council Call Centre and ratepayers
Dealt with the different components of Council, both Officer and at a Political level
(2 years 8 months)
Design and prepared (using Autocad 2008) Civil engineering infrastructure drawings which included wharf structures, heavy duty pavements and all utilities (including tallow and oil)
Occasionally prepared architectural drawings for Council submission.
Designed and established a precast yard for the construction of 13 tonne akmons which were used to re armour the breakwater
Managed the re armouring of the breakwater (in excess of $1.6million)
Formulated tender documents, including all schedules, managed the tender process and awarded tenders
Managed construction projects after tenders were awarded
Managed contract payments in terms of the General Conditions of Contract NZS 3910
Prepared development layout plans
Participated in the preparation of the annual maintenance budget
Spearheaded the preparation of the initial concept and layout drawings for the No 3 Wharf Development and prepared the project cost estimate ($78million project)
(1 year 4 months)
Provided technical advice to the public about the location and type of structures that may be permitted close to or over water, sewer or stormwater services
Scrutinized building plans to determine whether water, sewer or stormwater services would be affected by the proposed structures
Determined whether water and sewer connections could be supplied as requested on building plans
Commented and set conditions for approval of subdivisions, rezoning, consent use and departures
Certified rates clearances after checking that all council conditions have been met
Involved in the initial scoping and ratepayer expression of interest registration for prepaid watermeters
Monitored the water reservoir levels/alarms (via telemetry based software) and extracted data for demand monitoring and management
(3 years 2 months)
Investigated stormwater, wastewater, water network ults
Prepared visual / cctv camera inspection and condition survey reports identifying services that require maintenance and replacement
Reported on and amended Councils services records
Supervised camera operation field staff and camera equipment
(2 years 1 month)
Performed pre-tender site inspections
Scrutinized plans for ostensible information
Prepared quotes and formal tenders
Planned and managed the construction process
Managed project expenditure budgets
Implemented and managing quality protocols
Managed relationships with existing clients and contractors
Produced as-built plans through the use of Autocad
Project Management Quantity Surveying Construction / Engieering Economics Activity Based Costing Risk Management Strategic Analysis Process Mapping Value Stream Mapping Quality Management Construction Methodology/Engineering